Y & K Excavation
  • Home
  • About
  • Services
  • Contact
  • Gallery

Gallery

  • Cat earth mover

    WE WILL MOVE THE EARTH FOR YOU


    Button
  • Building a retaining wall

    High Quality Concrete Services


  • Concrete Stairs & Sidewalk

    High Quality Concrete Services


  • Septic System being installed

    COMPLETE SEPTIC SYSTEM INSTALLATION

    Write your caption here
    Button
  • Drain Field being installed for Septic System

    COMPLETE SEPTIC SYSTEM INSTALLATION

    COMPLETE SEPTIC SYSTEM INSTALLATION

    Button

GALLERY


CONCRETE WORK
Concrete Stairs
Button
Concrete Sidewalk Drying in Sun
Button
Concrete Stairs & Patio
Button
Concrete Driveway
Button
Concrete Stairs with Stone Border
Button
Colored & Stamped Concrete Sidewalk to Look like Brick
Button
Parking Lot
Button
Parking Lot
Button
Concrete Porch
Button
Button
Concrete Porch
Button
Concrete Foundation
Button
Concrete Decorative Walkway
Button
Concrete Sidewalk Commercial Building
Button
Concrete Foundation & Workers
Button
Concrete Stairs, Colored
Button
Concrete Foundation
Button
Decorative Concrete Stairs Outside
Button
View more

SEPTIC WORK  

Septic Tank being installed
Button
Septic Drain Field Installation
Button
Septic Drain Field Installation Residential Home being built
Button
Septic Excavation
Button
Septic Drain Field being Installed
Button
Septic Drain Field being Installed Wide View
Button
Septic Drain Field being Installed Narrow View
Button
Septic Drain Field being Installed
Button
Septic Drain Field being Installed among landscape
Button
Septic Drain Field being Installed among trees
Button
Septic tank & pipe being laid
Button
Septic drain field & pipe being laid.
Button
View more

FOUNDATION WORK

Foundation form being prepared
Button
Foundation being repaired
Button
New building foundation being laid - Concrete
Button
Dirtwork and Foundation Preparation
Button
Home Foundation being built
Button
Foundation being built on slope
Button
Foundation of basement level being built
Button
Foundation built in snow
Button
Thick Foundation being constructed.
Button
Concrete being constructed.
Button
Concrete foundation with retaining wall
Button
Concrete foundation on slope multi level.
Button
Concrete being formed for foundation
Button
Button
Thick foundation being laid.
Button
Foundation with concrete retaining wall
Button
Foundation with retaining wall
Button
Residential Foundation ready
Button
Residential Foundation & landscape mountains
Button
Cat moving dirt at foundation build
Button
Concrete foundation bing tarred
Button
Forms ready to lay concrete foundation
Button
Concrete Pillar Foundation
Button
Building being being built on top of concrete pillar foundation
Button
Excavator finishing dirtwork around foundation.
Button
View more

EXCAVATION WORK

Excavation readying new home construction
Button
Excavator moving dirt at build location
Button
Moving dirt and evening ground for a building project
Button
Button
Digging a trench near road.
Button
Excavator dumps dirt into truck
Button
Pipework excavation
Button
Photo of Excavators with Y&K Excavation logo
Button
Workers building a culvert and retaining wall
Button
Excavator digging a trench for pipe.
Button
Leveling groundwork.
Button
Excavator digging place for septic tank.
Button
Excavator digging septic system
Button
View more

-ADDITIONAL PROJECTS-

CITY OF SALIDA SEWER TRUNK REPLACEMENT
River Start Project
Button
Button
River Start Pipe Laser
Button
Button
Button
River Start Pipe being built
Button
Button
Button
Concrete laid over pipe
Button
Button
Dirt being laid over pipe project
Button
Button
View more

ADA ACCESS RAMP INSTALLATION
ADA access ramp bing before - door
Button
ADA access ramp built - before sidewalk
Button
ADA access ramp built - destruction
Button
ADA access ramp built - destruction of concrete
Button
ADA access ramp built - New concrete ramp
Button
Button
ADA access New concrete ramp & stairs
Button
ADA access New concrete finished project with handrails
Button
View more

CROSSROADS VILLAGE SUBDIVISION
Equipment
Button
Excavation begins
Button
Pipes being laid
Button
Pipes being laid for subdivision
Button
Concrete tanks being brought by semi
Button
Tanks being installed with water lines
Button
Water Line Installation
Button
Leveling land for road
Button
Laying asphalt for road
Button
Aerial of road being built for subdivision
Button
Streetlight Pole and sidewalk
Button
Sidewalks for neighborhood
Button
View more

More Projects


CONTACT US

719-539-4108

309 Blake St

Salida, CO 81201


8506 County Rd 150

Salida, CO 81201

  • Home
  • About
  • Services
  • Contact
  • Gallery
Copyright © 2019 All Rights Reserved.          Website Design by Names and Numbers
Share by: